Wind power

Offshore wind towers — internal and external protection

Salt spray and constant humidity at the coast. Tower sections received cold spray zinc on the external surface followed by an epoxy intermediate and a polyurethane topcoat; the internal surface used the same base with a lighter build. The single-component format removed mixing errors across multiple application crews working in parallel.

Wind power — Offshore wind towers — internal and external protection
Representative photograph of this structure type, not a site record of this project.
CorrosivityC5-M / CX
SystemZD96-1 + MIO epoxy + ZD6430
Total dry film320 µm
Coated area41,000 m²

Why hot-dip galvanizing was not an option

Tower sections in the 6–8 m diameter range have to leave the yard fully coated inside and out. The external face sees salt spray, UV and a splash zone that never fully dries; the internal face is a confined space where dehumidification is difficult and ventilation is limited. That makes the mix ratio and pot life of a two-component product the single biggest execution risk — with several crews working parallel sections, one wrong ratio leaves a patch that never cures, and that patch is inside a tower nobody will open for years.

System selection

Both faces take ZD96-1 as the base, single-component and ready to use straight from the container — that choice removes the mixing step entirely and with it the dominant failure mode above. External build: 80 µm zinc base, MIO epoxy intermediate, ZD6430 topcoat, 320 µm total. Internal build uses the same base at a lighter total, roughly 200 µm, finished with epoxy rather than polyurethane: there is no UV inside, so paying for an aliphatic topcoat would buy nothing.

How it was applied

Internal surfaces were sprayed with forced ventilation running, operators on supplied air and continuous gas monitoring — solvent-borne coatings in a confined space are an explosion and exposure risk, and this is the part of the job that governs the safety plan more than the coating does. Sections rotated on rollers so one set-up covers the full circumference. Flange faces, weld bevels and bolt holes were taped before spraying and the tape pulled while the film was still green; leaving it until cured tears the coating at the chamfer.

Acceptance and follow-up

External surfaces were checked to ISO 12944 for thickness and adhesion. Internal surfaces got an additional holiday test — low-voltage wet sponge on the epoxy finish, or spark testing where a conductive lining applies — because a pinhole on the inside of a tower is not visible again for the life of the structure. Flange mating faces must be free of coating; flatness is re-checked before the sections are bolted, since a film left on a mating face silently changes the preload.